Document Center

The document center provides access to prior studies and reports related to the Brent Spence Bridge Corridor project. Ohio and Kentucky are in the process of reviewing the design and engineering study that was completed several years ago. Document appendices are available upon request by submitting a comment.

Click on the state name to access PDFs of the recommended alternative plan views for Kentucky (3.7mb) and Ohio (5.8mb).

Memorandum of Understanding (MOU) arrow-location-down

A Memorandum of Understanding (MOU) was entered into between Ohio and Kentucky on October 4, 2004 to study the Brent Spence Bridge Corridor. There have been six supplements. Below is a link to a file containing the original MOU and all supplements.

MOU Agreements 8.8MB

2005 arrow-location-down

2006 arrow-location-down

2009 arrow-location-down

2011 arrow-location-down

2012 arrow-location-down

2013 arrow-location-down

2014 arrow-location-down

2015 arrow-location-down

2017 arrow-location-down

2018 arrow-location-down

2019 arrow-location-down

2020 arrow-location-down

2021 arrow-location-down

2022 arrow-location-down